Building out a cleanroom and adjacent environments is a multi-stage construction process and particular protocols must be maintained at each stage of the construction to insure the integrity of the cleanroom. The stages are Stage 0 — Regular Construction; Stage 1 — Clean Construction; Stage 2 — Pre Cleanroom Construction; and, finally, Stage 3 — Active Cleanroom. Following are the important steps in each stage.

The regular construction phase is what must contractors are used to, but in the context of a cleanroom special attention should be paid to housekeeping to set the tone for cleanliness. At this stage there are no material restrictions and standard personal protective equipment, such as hard hats, safety glasses and vests, should be used. Take care to protect building materials as well. Construction workers should apply standard good housekeeping practices and complete daily and hourly clean-ups.
All drywall work should be complete if possible before the first stage of actual clean construction. During this phase, conduct daily and hourly cleanup using vacuums and start using a daily cleaning service. There should be no unnecessary trash or debris in cleanroom area and you should use multiple rugs as well as sticky mats to prevent dirt from entering. This is also when you begin to conduct particle counts.
In the second stage, control and limit access to the cleanroom area and establish a smock room/air lock for entry/exit with an air cleaner. Workers must wear booties in the area and use sticky mats on floors. There should be no wood, cardboard, or paper allowed in the area. A HEPA vac is required for all cutting/drilling in the cleanroom and the air systems should be on, but not the FFUs.
The third stage, which is for punching and finishing details, is the most restrictive. It includes all the precautions of Stage Two, plus several additional steps. At this stage, access is limited and workers must be fully smocked, including wearing lab coat or coveralls, hair/beard nets, booties, and gloves, and they must use a designated smock room. In addition to operating the MUA system, recirculation air is continuously cleaning the air.
Il rispetto di tutti i requisiti specifici di una camera bianca comporta un aumento dei costi di costruzione, ma questo varia in base al tipo di camera bianca, con le camere più strette e più restrittive che costano di più. In media, la gamma di prezzi per le camere bianche va da $1.000 al piede quadrato per una camera di Classe 1 fino a meno di $200 al piede quadrato per una camera di Classe 100.000.
Non lasciatevi intimidire dal processo di costruzione della camera bianca. In fin dei conti, si tratta pur sempre di una costruzione. Seguendo i piani e le specifiche e rispettando le linee guida per ogni fase, la costruzione della camera bianca può essere eseguita con successo e con pochi problemi. Per facilitare il processo, ricordate che la pre-costruzione è molto importante, quindi sviluppate in anticipo un programma dettagliato e gestite con attenzione gli appalti. Comunicate chiaramente il programma di costruzione a tutte le parti interessate per mantenere tutti sulla stessa pagina. Poiché le cose cambieranno, preparatevi a gestire gli imprevisti e ad essere flessibili e adattabili.
Constructing cleanrooms is challenging, requiring careful attention to specific details in both design and construction procedure. Using the accepted industry standards and the UM as blueprints, however, will facilitate the successful completion of a cleanroom. Working in partnership with the cleanroom operator on the specific design assures that the resulting room will meet the needs of end users and enable them to achieve a desired ROI from the operating space.